Technical specification for burning machine

Technical specification for burning machine 1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to  burn different kinds of drugs. All need equipment must be provided. 2.Warrantee:  booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative  maintenance repair and corrective maintenance must be included in the cost and provided to the customer. 3.All needed electric and water connections must be provided. 4.Both systems must be of high quality and must be environmental friendly. 5.The capacity of each system should be up to 100 kg/hr. 6.The system must have automatic feeding. 7.Each system must consists of two burning  rooms, one primary room for burning the drug and another room for burning the gases  that emit as  a result of primary burning.  8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm. 9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials. 10.Waste products should not exceed 5%. 11.System must have automatic ignition system.  12.System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr .  13.Each system should be provided with fuel tank  of size adequate to operate the system for one full day. 14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system  should be capable of continues operation and should be provided with cement layer insulator with adequate thickness. 15.Oven should be provided with heat insulator to allow easy operation. 16.Gas should remain in the secondary room for not more than 1.5 second. 

SPECIFICATIONS OF THE MEDICAL BIOLOGICAL WASTE INCINERATOR

SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2                                                             Spare part list – After burners                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2 Spare part list – Ram loader                           Item description                   N0 of required                         Reed switch                               4                        Seal kit                                       1      Medical waste incinerator Accessories  – Clean out tools – Loading and ash removal methods.      – Fuel storage tank with the two pump and all accessories.  – Flue gas cleaning system […]

MEDICAL/BIOLOGICAL WASTE INCINERATOR

SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the  atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the  chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire  hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.

Spesifikasi Incinerator 200kg/jam

Spesifikasi Incinerator 200kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang                                : INCINERATOR Type / Model                 : PWR-INC-KMN 20 Kapasitas                                 : 200kg/Jam (2 m3) Length                               : 384 cm   Width                                : 182 cm   Height                                    : 213 cm   Height of Chimney std            : 700 cm   TOTAL WEIGHT                   : 9.500 kg  Panel – timer                 : Digital Included Auto Alarm Finishing                            : Hot endured paint  Fuel tank                           : 200 Liter  Covering Element from steel   : 3-8mm  Banyaknya Burner                   : 3 pcs   Banyaknya Blower               : 2 pcs  Max. Fuel consumption           : 15-40 Liter/Jam  Max. Elektric consumption  […]

complete with electric ignition and flame failure controls wired with continuous running fan

The waste will be reduced by 90~95% to leave 10 -5% ash   2.4 Quality/Environmental Standards   NEMA ACT (EMCA) 1999 BS3316   2.5 Operating Period   Anticipated daily operating period 8 hours   Maximum operating period 12 hours   2.6 Chamber   Should be refractory lined to the following standard; Hearth and lower section of chamber walls   2.7 Hot face material   Super duty firebrick   Limiting continuous service limit 1500°C   Thickness 100mm   Thermal conductivity 1.3 W/mk   […]

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   v.  Estimated ash  residue 5-10%   vi.  Nominal capacity  50Kg/hour batch load   vii. […]