Medical Waste Burner PROPOSITION


I. Measurement of the Incinerator 4,410 W x 3,037 L x 4,836 H mm

II. Energy

Utility issue for the incineration gadgets running is the sticking to.

1) Gas: Light oil or Kerosene

2) Electrical Power

Electric Motor

-0.1– – 110kW: Air Conditioner 220V x 3PH x 50Hz

– – – – Below 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit

– – – – MCC control: A/C 220V x 1PH x 50Hz

– – – – Tool: Air Conditioner 220V x 1PH x 50Hz

– – – – Switch over Over Gear: Air Conditioning 220V x 1PH x 50Hz

2.

– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz

2. Door -to-door transportation, Setup, Commissioning and Training

3. Prices quotation

– – Cost requires to be given in Ethiopian Birr (incl. VAT)

– – Cost need to include extra cost elements such as products, insurance, installment and training for essential personnel, until approval obligation where suitable


Medical Waste Burner PROPOSITION


I. Measurement of the Incinerator 4,410 W x 3,037 L x 4,836 H mm

II. Energy

Utility issue for the incineration gadgets running is the sticking to.

1) Gas: Light oil or Kerosene

2) Electrical Power

Electric Motor

-0.1– – 110kW: Air Conditioner 220V x 3PH x 50Hz

– – – – Below 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit

– – – – MCC control: A/C 220V x 1PH x 50Hz

– – – – Tool: Air Conditioner 220V x 1PH x 50Hz

– – – – Switch over Over Gear: Air Conditioning 220V x 1PH x 50Hz

2.

– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz

2. Door -to-door transportation, Setup, Commissioning and Training

3. Prices quotation

– – Cost requires to be given in Ethiopian Birr (incl. VAT)

– – Cost need to include extra cost elements such as products, insurance, installment and training for essential personnel, until approval obligation where suitable